Raclin Murphy Museum of Art
The University of Notre Dame began construction on the Raclin Murphy Museum of Art, with a planned completion in fall 2023.
“Since its founding, Notre Dame has valued the vital role the visual arts play as an expression of human creativity, religious experience and insight into the human condition,” University President Rev. John I. Jenkins, C.S.C., said. “By bringing the collections currently in the Snite Museum of Art to new life in the Raclin Murphy Museum, we will be able to share these treasures in all their richness with our University community, our neighbors in the region and the wider world.”
With a site in the northwest corner of the Charles B. Hayes Family Sculpture Park on the south side of the campus, the Raclin Murphy Museum will be an outward-facing structure, serving both as a gateway to the University and as a welcoming community partner. Carefully situated to work in harmony with the landscape and the outdoor collections of the park, the new museum will be surrounded by green spaces that will allow for the growth of the outdoor sculpture collection. The location was selected to contribute to the University’s arts district, which now includes the DeBartolo Performing Arts Center, Walsh Family Hall of Architecture and O’Neill Hall of Music.
“This new museum building and its collection will bring together the healing power of the arts, of creativity and our strengthened humanity and solidarity — so needed as we move beyond the pandemic,” Marie Lynn Miranda, the Charles and Jill Fischer Provost of the University, said. “The diversity and inclusion represented in all forms of visual arts are gifts we must share and experience with one another.”
Designed as a 132,000-square-foot complex to be constructed in two phases, the Raclin Murphy Museum of Art will greatly enhance exhibition and education spaces for the permanent collection. Phase one will encompass 70,000 square feet devoted to gallery and teaching spaces, a café and retail space. The scale of the project resulted from meticulously studying the Snite Museum’s collection and exhibition requirements to best showcase its holdings. The plans were also researched in comparison to museums at leading peer institutions in the U.S. and Europe.
Project News
Project Photos
Project Details
- Construction Start Date
- Spring 2021
- Occupancy Date
- Fall 2023
- Gross Square Footage
- 132,000