Remick Family Hall Construction Area

Author: Department of Facilities Design & Operations

Remick Family Hall Site Plan 02 06 20 1

As part of the ongoing construction north of the Main Building, the sidewalk between the circle drive and the Basilica of the Sacred Heart will be closed for approximately one month to allow for the construction of new site utilities. To access areas west of the Main Building, pedestrians are recommended to walk along the south side of the building. (See the aerial map for details.)